Scattered.
Certificates, permits and work orders live in different systems and on paper. No single view of what’s complete.
Introducing Resolve, our fast decision-making model. Meet Resolve →
Know what’s ready before you restart. Every inspection. Every certificate. Every open issue.
See it worked throughThe maintenance is finished. Whether the plant can start depends on what every inspection, certificate, permit and work order says. And those records sit in different systems, formats and filing cabinets.
Certificates, permits and work orders live in different systems and on paper. No single view of what’s complete.
Engineers compare finished work against the restart procedure line by line. It can take longer than the work itself.
An expired certificate or open snag surfaces at the final go/no-go review. The restart slips.
Every record the restart depends on, in whatever form it arrives, checked against the requirement it has to satisfy.
One readiness record. Every line carries its evidence.
Not a dashboard to interpret. A readiness record your engineers and operations leads can review together.
8 ready · 2 outstanding · 1 blocking
| Tag | Equipment | Status | Evidence | Owner |
|---|---|---|---|---|
| Feed section | ||||
| V-101 | Feed drum | Ready | Internal inspection signed | Static |
| P-102A | Feed pump | Ready | Work order closed · vibration test passed | Rotating |
| XV-103 | Isolation valve | Ready | Function test signed | Instrument |
| E-104 | Feed exchanger | Outstanding | Leak test result not on file | Static |
| Column & overhead | ||||
| T-201 | Column | Ready | Tray inspection signed | Static |
| E-202 | Condenser | Ready | Bundle cleaned · work order closed | Static |
| V-203 | Reflux drum | Ready | Thickness survey within limits | Integrity |
| P-204 | Reflux pump | Outstanding | Alignment check still open | Rotating |
| PSV-2104 | Relief valve | Blocking | Certificate expires before restart | Integrity |
| Bottoms & export | ||||
| E-205 | Reboiler | Ready | Hydrotest certificate valid | Static |
| K-301 | Compressor | Ready | OEM service report on file | Rotating |
Requirement
Every pressure relief device must hold a valid test certificate on the day of restart.
Restart procedure RP-02 · §4.2 · p.11Evidence found
Test certificate for PSV-2104. Tested 14 March. Valid for 24 months.
TC-7731.pdf · scannedConflict
Certificate expires 14 March. Planned restart is 21 March.
Shutdown plan · rev 6Open work
Recertification raised, waiting for a workshop slot.
Work order WO-448178Ready
2Outstanding
1Blocking
Open before restart
Sign-off
The AI prepares the decision. People make it.
Illustrative example. Equipment tags, records and dates are fictional.
Restart records sit on the operational side of the fence. The AI can run there too.
On-premise, at the edge, or fully air-gapped. The records never have to leave the site.
Deployment options ↗The AI prepares the decision and shows its working. Your engineers confirm, override and sign.
How Operate works ↗Every judgement, override and sign-off is kept, ready for the next shutdown and the next audit.
Security & trust ↗The evidence a restart depends on answers other questions too.
What fails next?
Spot the patterns and warn what may fail next.
See how →What needs maintenance, and when?
Decide what should be maintained, and when.
See how →What here isn’t safe?
Flag what’s unsafe or incomplete.
See how →Is the supplier’s evidence complete?
Find missing or inconsistent evidence.
See how →We’ll run it through the AI and show you what a live readiness record would have caught.
Talk to us →